Message boards :
Graphics cards (GPUs) :
Constant scheduler requests for more work
Message board moderation
| Author | Message |
|---|---|
|
Send message Joined: 24 Feb 09 Posts: 14 Credit: 1,261,660 RAC: 0 Level ![]() Scientific publications ![]() ![]() ![]()
|
I signed up for GPUGrid a few days ago. I'm seeing constant scheduler requests for more work with the response 'per-CPU limit of 1 tasks, no jobs available'. Happens every 1-2 minutes. Any idea why or how to stop this? Running on dual core/dual proc (4 cores total) AMD with two 9600 GT's in NON-SLI. Forgot to add, I have two WU's in progress and another two waiting to start. Thanks, Jim |
K1atOdessaSend message Joined: 25 Feb 08 Posts: 249 Credit: 444,646,963 RAC: 0 Level ![]() Scientific publications ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
|
I think this has something to do with the change to the server side to get rid of the 24 hour backoff problem. Now it checks very frequently for new work. I prefer this problem over the 24 hour backoff, and given you have 4 cores and 4 WU's you are right where you should be. |
|
Send message Joined: 24 Feb 09 Posts: 14 Credit: 1,261,660 RAC: 0 Level ![]() Scientific publications ![]() ![]() ![]()
|
Okay cool. Just wanted to make sure I didn't have some screwed up config that was sending a bunch of traffic to the server. Not that it would be a lot but still :) Is this fixed in a newer version? I'm on 6.5.0 now. Thanks, Jim |
Paul D. BuckSend message Joined: 9 Jun 08 Posts: 1050 Credit: 37,321,185 RAC: 0 Level ![]() Scientific publications ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
|
Okay cool. Just wanted to make sure I didn't have some screwed up config that was sending a bunch of traffic to the server. Not that it would be a lot but still :) You are getting appropriate messages, your client needs work, the server won't give you any because you have too many failures or you already have the most work you are allowed to queue ... as you return valid work the number will rise to the max of 4 ... in the mean time, as long as you have work in progress the only down side is that the request goes out and gets no satisfaction. |
©2025 Universitat Pompeu Fabra